Material: 45# Carbon Steel Technology: Drop Forged Surface Finish:Electro Galvanized Ultimate Load:4-6 Times Of the WLL Heat Treatment:6 times
| Unit Price | MOQ | Lead Time |
|---|---|---|
| USD 0.01 / Pieces | 1,000 Pieces | 7 days |
Material: 45# Carbon Steel Technology: Drop Forged Surface Finish: Electro Galvanized Ultimate Load: 4-6 times Of the WLL Heat Treatment: 6 times
| Unit Price | MOQ | Lead Time |
|---|---|---|
| USD 0.00 / Pieces | 1,000 Pieces | 7 days |